AI-assisted translation · the German version is authoritative.
WHAT DOES YOUR OIL CHANGE REALLY COST? · DOC TECHNOLOGY
Note on the calculation
The results of this calculator are non-binding model calculations based on your input, published technical sources and typical assumptions (e.g. oil prices, change intervals, wear and downtime costs). Savings cannot be guaranteed 1:1: the actual result depends on numerous operating and ambient conditions that cannot be captured in general terms – as well as on the material composition of the oils and additives used, which is never completely identical from case to case. The calculation therefore shows a statistically well-founded trend; deviations in individual cases cannot be ruled out. It does not replace an individual assessment.
⚡ QUICK CALCULATOR
🔬 FULL-COST CALCULATOR
📊 RESULT / BENEFIT
⛽ FUEL / SAVINGS
🔌 INSULATING OIL

All prices net plus 19 % German VAT.

3 inputs — instant result. How much oil do you have, how often do you change it, what does it cost? Optionally add fuel savings and fleet effects.
PRESELECT INDUSTRY
OIL & CHANGE INTERVAL
LKW-Motor 30–40 L · Bagger 10–40 L · Hydraulik 10–2.000 L · Biogas-Motor 80–120 L
Total workshop invoice: typically 100–500 € · incl. oil, labour, disposal, travel
FLOWLOGIC INVESTMENT
Gross incl. 19% VAT: —
Tool-free replacement · approx. 5 minutes · no specialist staff needed
🚛  FLEET / NUMBER OF UNITS
1 = single vehicle · fleet: e.g. enter 15 trucks · multiplies savings & investment
📌 For mixed fleets (trucks + vans + cars):
repeat the calculator 2–3 times and add up the results.
Calculate trucks → vans → cars separately.
⛽  FUEL SAVINGS — optional (approx. 1–3 % lower consumption)
0 = nicht einberechnen · LKW typisch 100.000–200.000 km/Jahr
Trucks: 28–38 L · vans: 9–14 L · cars: 5–9 L
Measurably lower fuel consumption thanks to clean oil

All prices net plus 19 % German VAT.

Only 2 required inputs. Oil quantity and change interval — everything else is pre-filled with general guide values.
All values can be adjusted at any time. Feel free to experiment.

↘ At the end of the inputs: click 📊 CALCULATE — the result appears immediately.
PRESELECT INDUSTRY
⚡ ONLY THESE 2 INPUTS ARE REQUIRED
Truck engine: 30–40 L  ·  excavator/construction equipment: 10–40 L
Hydraulic system: 10–2,000 L  ·  large-scale equipment: up to 5,000+ L
Biogas/CHP engine: 80–120 L (extra large for longer service life)
Truck with loading crane: add engine + hydraulics separately
= — pro Jahr  
🚛  FLEET / NUMBER OF UNITS
1 = one unit · e.g. enter 15 trucks or 4 hydraulic systems · multiplies costs, savings & investment
📌 All inputs above apply per unit.
For mixed fleets (e.g. trucks + hydraulic systems) calculate each type separately and add them up.
📊 FULL CALCULATION · ALL VALUES ADJUSTABLE
✏️ The following figures are general guide values. You can simply click on any value and overwrite it with your own figures.
🛢️ OIL & DISPOSAL
Fresh oil
Hydraulic oil market price Germany April 2026 · increased due to the Iran conflict
€/L
—
Waste oil disposal
Disposal certificate + collection (Germany): 0.30–0.50 €/L
€/L
—
Oil storage costs (pro rata)
Industrial rent + drip tray + hazardous materials store: ~0.10–0.18 €/L/mo
€/L/mo × interval
—
🔧 LABOUR & WORKSHOP
Mechanic labour costs
German metalworking pay scale 2026 incl. non-wage costs: 82–95 €/h
€/h × h
—
Workshop occupancy costs
Lifting platform, energy costs, share of bay: ~12–20 €/h
€/h × mechanic hours
—
🚗 TRANSPORT · TRUCK / LOW-LOADER (outward & return)
Fuel costs (×2 trips)
Truck/low-loader: ~50 L/100km · truck only: ~30 L/100km · diesel price Germany 2026: ~1.85 €/L
km × L/100km × €/L ×2
—
Driver costs (driving + loading/unloading)
Professional driver Germany 2026 incl. non-wage costs: ~35 €/h · loading time low-loader/excavator: 1.5 h · truck only: 0 h
h driving + h loading/unl. × €/h
—
⏱️ DOWNTIME & ADMINISTRATION
Downtime costs
Machine output + lost revenue incl. travel to and from
h × €/h
—
Administrative effort
Scheduling, documentation, order: ~0.75 h · office staff Germany: 32–42 €/h
h × €/h
—
📦 MATERIAL & OTHER
Material, seals, consumables
Filter insert (old), seals, retaining rings etc.
€ flat rate
—
Other costs (not covered)
e.g. heavy transport, shipyard costs (ship), crane costs (wind power), berth costs etc.
€ flat rate
—
TOTAL COST PER OIL CHANGE —
× — Wechsel pro Jahr = KOSTEN PRO JAHR —
Sources: German pay-scale data 2026 · disposal certificates · Federal Employment Agency · own surveys
All values are guide values — click on a figure to adapt it to your situation.
✓ FLOWLOGIC DOC INVESTMENT (one-off)
Gross incl. 19% VAT: 748,00 €
5 min · tool-free · no specialist staff · no waste oil
The filter insert absorbs a small amount of oil when first filled
YOUR ANNUAL SAVINGS
—
per year · at current oil prices
—
Those who can calculate don't ask about the price of the filter.
✕ WITHOUT FLOWLOGIC
—
✓ WITH FLOWLOGIC DOC
—
PROJECTION OVER THE YEARS
PERIOD WITHOUT FL. WITH FL. ADVANTAGE
Bitte zuerst berechnen.
FURTHER BENEFITS — IN ADDITION TO THE € SAVINGS
> 60 %
less wear
Field estimate · more or less depending on the equipment
⌀ > 4 ×
longer engine life
Practical value · not a fixed value · varies individually
5.000 → 160 ppm
Water in the oil
Field analysis · almost complete drying
2 – 4 ×
longer change intervals
Oil change intervals can be extended considerably · in practice: 100,000 km car / 300 h construction machine without oil change
These benefits are not included in the € calculation above — they further increase the actual overall benefit considerably.
"A sand filter can sort out stones. A stone filter cannot remove sand."
Standard filters (10 µm) let the most dangerous particles (1–8 µm) pass unhindered. Ultra-fine filtration based on the FLOWLOGIC principle filters down to < 1 µm and removes water almost completely. In a field test (100,000 km without oil change), the ultra-fine filtered oil showed a 4.25-fold higher load-bearing capacity on the Reichert wear balance than fresh branded oil.

In many applications, the very first oil change saved already offsets the investment mathematically. From the second oil change saved: savings, year after year.
📩  Request this calculation without obligation

Your figures are sent automatically — you will immediately receive a confirmation by e-mail.

NANO-LOGIC · DOC Technology powered by FLOWLOGIC · Klimaschutz-Produkte · klimaschutzprodukte.info
Calculation based on the values entered. All information without guarantee — guide values for orientation.
Fuel savings through friction reduction. Clean oil measurably reduces internal friction — studies show 1–3 % lower fuel consumption. Typical average: 1.5 % (SAE Technical Papers, fleet trials). Enter your mileage — and see what this means until the end of the year and in the following years.
VEHICLE & FUEL
Car: 15,000–30,000 · truck: 80,000–150,000 · construction machine approx. 20,000
Car: 7–12 L · truck: 28–40 L · excavator/wheel loader: 15–35 L
Current prices: → ADAC fuel prices (Germany)  ·  adjust the value here manually
◀ slide ▶
1 % = conservative · 1.5 % = average (recommended) · 3 % = optimal result
🎲 GAME — ANNUAL FUEL PRICE INCREASE (OPTIONAL)
◀ slide ▶
0 % = constant price · 3 % = historical average Germany · 5 % = moderate scenario · 10 % = extreme scenario
Fuel prices are unpredictable. This option simulates different scenarios — not as a forecast, but as a thinking tool: "What if fuel becomes X % more expensive every year?"
Insulating oil calculator · transformers & switchgear
Periodic conditioning according to IEC 60422 costs 8,000–15,000 € per cycle. Ultra-fine filtration maintains the oil continuously — reconditioning cycles can largely be avoided. Enter your installation and see the direct savings over 10 years.
INSTALLATION & OIL QUANTITY
Small transformer: 500–2,000 L · distribution transformer: 5,000–30,000 L · large transformer: 30,000–80,000 L
CONDITIONING WITHOUT FLOWLOGIC
Typically: 8,000–15,000 € · special equipment + downtime + logistics + analysis
Typically: 2–5 years depending on load and IEC 60422 measurement
FLOWLOGIC — FILTER OPERATION
Recommended for transformers: 30 cm
Rule of thumb: 1 filter / 2,500 L · preset adjusts automatically
Typically: 2–4 × / year · under high load: up to 6 ×
INSTALLATION VALUE & RISK REDUCTION optional · actuarial approach
Replacement value · enter 0 = hide risk block
◀ slide ▶
Typically 1–3 % · IEEE C57.106: oil quality = central failure risk factor · IEC 60422: conditioning significantly reduces partial discharge risk